43
Recommendation No.1.
RC S
Paragraph 5 of
Hong Kong despatch.
Recommendation No.2.
PIERS
Paragraph 6 of Hong Kong despatch.
Recommendation No.3.
FERTILISER FACTORY
Paragraph 7 of Hong Kong Despatch.
Recommendation No.4.
IRRIGATION
Paragraph 8 of Hong Kong despatch.
MEMORANDUM.
The cost of construction of 24 miles of
feeder roads at £100,000 appears to be excessive,
but feeder roads are clearly an essential to
development. In the circumstances it is
suggested that £50,000 might be allocated to
feeder roads for the time being, to be spread
over the next two years, and that the position
should then be reviewed.
Here again the costs appear to be on the
high side, and it is suggested that £50,000
should be allocated for this purpose, to be
spread over the next two years, and that the
position should then be reviewed.
The fertiliser factory should be run as far
as possible on commercial lines. The project
appears, however, somewhat experimental and
in these circumstances, it is suggested that it
should be financed on the basis of 50% C.D. & W.
grant and 50% loan from other sources.
-
The estimates for this desirable project
seem to be far too low. An irrigation
engineer, if he can be obtained at the age
level contemplated, will cost with passages,
superannuation, etc., not less than £1,200 -
£1,500 per annum. His subordinate staff will
involve an expenditure of an equal amount and
for expenditure on works a sum equal to at
least double the total cost of salaries should
be allowed if technical skill is not to be
wasted. For a five-year scheme, an
estimate of £45,000 should be the minimum
budgeted for.
Recommendation/